...
On making a property available again, a specific re-let checklist is created - this checklist uses specific checks within the pre-instruction checklist and/or new re-let checks, as required and configured (for
For more information on pre-instruction checks, see these guidesclick here: Pre-instruction checks) checklist - configuration option
This functionality helps to ensure that a property being re-let is compliant and ready to be marketed each time it is made available after initial instruction
To enable this configuration option, click here to contact Reapit Support
1. Make property available From tenancy: Beside tenancy Status, click Tenancy Current and select Tenancy finished/cancelled and click Yes to confirm, when prompted Click to Yes to mark property as available This must be done in order to initiate creation of the re-let checklist Image Modified
Or, if there’s a current tenancy and the property is to be made available again, ready to re-let From property: |
2. Create re-let checklist Note |
---|
To use the re-let checklist functionality, you must enter a re-let date & click Accept on the prompt below (clicking Cancel will prevent the re-let checklist from being created) |
Enter re-let date and click Accept Image ModifiedClick Yes to create new re-let checklist - after clicking Yes, the old pre-instruction checklist for the property will be frozen and the new checklist used If you do not wish to create the new re-let checklist at this stage, click No and skip to step 2a Image ModifiedThe new re-let checklist is displayed Image ModifiedThe re-let checklist is accessed on the property record via the Pre-Instruction Checks button This button is shaded red to indicate it is incomplete Image Modified
|
2a. Create new checklist later If you chose not to create a re-let checklist when prompted (see previous step), this can be done when required From property: Hover over Pre-Instruction Checks button and right-click Select Create new re-let checklist - when choosing this option, the old pre-instruction checklist for the property will be frozen and the new checklist used The new re-let checklist is displayed Image Modified |
3. View previous checklists An option to view previous checklists is available From property: Hover over Pre-Instruction Checks button and right-click
Select View archived pre-instruction checks
Dates of previous checklists will be displayed in a list
Select required checklist and click Accept
Previous checklists are read-only & cannot be changed
| Image ModifiedImage Modified |
4. Add incomplete re-let checks on Organiser Incomplete re-let checks can be flagged on the Organiser, this needs to be added to the panel and saved first From Organiser: In the Overview or To-do List panel (for example) hover over panel header and click cog icon
Tick Re-let checks incomplete
Click tick (top right) to save Panel Setup
See next step
| Image ModifiedImage Modified |
5. Incomplete re-let checks flagged on the Organiser From Organiser: | Image ModifiedImage Modified |
6. Reporting From Reports on main menu: Image Modified |
7. Example report For example, this report will return lettings properties where the logged in user is the Property Manager that have a re-let date after 01/09/2022 Other possible criteria options are available and displayed below Image Modified |
8. Add pre-instruction checks option to report When reporting on pre-instruction checks, the option to include checks with/without an Archive Date is available From reporting screen shown in step 6: Click Pre-Instruction Checks (from Linked Records section) Click Archive Date To return just current checks, set to empty To return archived/previous checklists: set a date filter e.g. select after then enter date Image Modified |
Related articles
Filter by label (Content by label) |
---|
showLabels | false |
---|
max | 8 |
---|
sort | modified |
---|
showSpace | false |
---|
reverse | true |
---|
cql | label = "checklist" |
---|
|
...