...
To enable this configuration option, click here to contact Reapit Support
1. Access tenancy renewal negotiation checklist From a renewal negotiation: Once renewal letters have been received, the References panel becomes available Click the link beside Checks - the Renewal Checks screen is displayed This is the same format used for other checklists, such as Pre/Post Tenancy Checks
Tip |
---|
For more information on completing tenancy renewal negotiations, click here |
|
2. Complete tenancy negotiation checklist The type/number of checks displayed is dependent on how your business have chosen to set this up Image RemovedImage AddedUse the link to the right of the check to update the status of it - options are: Needed, Not Needed, Sent/Arranged, Completed The paperclip icon beside the check allows you to attach associated documents When a check is complete, hovering over it displays who completed it and when If your configuration settings allow: The order of the checks can be changed:
|
3. Switch to legacy checks When accessing an existing renewal where old checklist items had already been completed, it is possible to switch to the old/legacy checklist format From a renewal negotiation: Where legacy checks exist, an asterisk (*) is displayed beside Checks Right-click over the link and select Switch to legacy checks Click Checks link to access legacy checks, along with the option to Switch to new checks Switch to new checks displays the new format checklist, as seen in steps 1 & 2
|
4. Reporting on checks Checks can be reported on when running Renewal Negotiation reports via Power Reports From main menu: Click Reports and select Power Reports Click report type and select Renewal Negotiations Image RemovedImage AddedPick required criteria to narrow down the renewal negotiations shown (e.g. Status) From Linked Records, click Checks Pick required Checks criteria To find renewals with no checks entered, click Renewal Negotiations has checks and change to Renewal Negotiations does not have checks
Example report |
...