Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

A configuration option is available which ensures that the next inspection date that is shown on the Management tab of a tenancy correlates with is the next inspection date showing in from the inspection schedule screen

When a difference between the dates occurs is due to how the next inspection date is arrived at:

...

With the configuration setting off (i.e.

...

the default behaviour):

  • the number of days set on the tenancy Management tab in Regular frequency* is added to the date of the previous inspection appointment date booked

With the configuration setting enabled:

  • the number of days set on the tenancy Management tab in Regular frequency* is calculated taken from the inspection schedule’s Inspection Due date instead
    The inspection schedule calculates the inspection due date from the start of the tenancy , rather than the date of the previous inspection appointment (which may have happened several days later/earlier than the schedule)and, while it still uses the regular frequency setting on the tenancy, the due date never changes regardless of when the inspection appointments took place

*and initial inspection frequency (where configured)

To avoid a difference between the dates shown on both screens, this configuration option can be used to ensure that the next inspection date shown on the tenancy matches the next date on is the same as the due date shown in the inspection schedule

To enable this configuration option, click here to contact Reapit Support

Tip

For more information on property inspection schedule functionality, click here:
Property inspection schedule overview

With the configuration setting enabled:

  • The Next inspection date matches the Inspection Due date on the inspection schedule, as it is calculated from the tenancy start date , (rather than the date of the last inspection appointment)

With the configuration disabled (default):

  • The Next inspection date is calculated by adding the number of days set in the Regular frequency field to the previous inspection appointment date, which can make it differ to the date shown in the inspection schedule

...

Info

In the example above, the inspection was scheduled for 09/01/2023 but the appointment took place on 13/01/2023 - 4 days later than scheduled

When the configuration is off
The Next date on the tenancy Management screen is shown as 90 days since the last appointment date (which is 13/04/2023) but the Inspection Due date on the inspection schedule is calculated as 90 days since the last inspection due date (which is 09/04/2023) - resulting in differing dates being shown on the two screens

When the configuration is on
The Next date on the tenancy Management screen shows the Inspection Due date taken from the inspection schedule - therefore both screens show 09/04/2023

Filter by label (Content by label)
showLabelsfalse
max8
sortmodified
showSpacefalse
reversetrue
cqllabel = "propinspection"
Excerpt
hiddentrue

Configuration option which ensures that the next inspection date that is shown on the Management tab of a tenancy correlates with is the next inspection date showing in from the inspection schedule screen